Products

Causeway Road Marking Aqua Paint

Causeway Road Marking Aqua Paint Image

DESCRIPTION

Causeway Water Based Road Marking Aqua Paint is an acrylic highly durable paint, specially formulated for marking asphalt, plots in parking lots, concrete floor, warehouses, halls long lines and crossings.

  • Excellent Adhesion
  • Fast Dry
  • High Durability
  • Long-Lasting Durability
  • Water Based.

TYPICAL USES

  • Used for domestic, industrial & commercial floor

APPLICATION

  • Apply onto concrete , Asphalt surface
  • Method of application
  • Spray
  • Roller
  • Brush

APPLICATION INSTRUCTIONS

  • Remove any dust, oil and other contaminants that may affect its adhesive property.
  • The surface must be thoroughly dried before application
  • It is ready to use and dilution not required.

(If necessary use 5% of clean water)

  • Recoating Interval is 20 minutes
  • Apply 1 – 2 Coat as per requirement.

Note : Drying time depends on environmental condition                  such as humidity and temperature.

HEALTH & SAFETY

Always keep paint out of reach of children. Ensure good ventilation during application and drying. Do not smoke while painting.

Causeway Road Marking Aqua Paint

Causeway Road Marking Aqua Paint Image

DESCRIPTION

Causeway Water Based Road Marking Aqua Paint is an acrylic highly durable paint, specially formulated for marking asphalt, plots in parking lots, concrete floor, warehouses, halls long lines and crossings.

  • Excellent Adhesion
  • Fast Dry
  • High Durability
  • Long-Lasting Durability
  • Water Based.

TYPICAL USES

  • Used for domestic, industrial & commercial floor

APPLICATION

  • Apply onto concrete , Asphalt surface
  • Method of application
  • Spray
  • Roller
  • Brush

APPLICATION INSTRUCTIONS

  • Remove any dust, oil and other contaminants that may affect its adhesive property.
  • The surface must be thoroughly dried before application
  • It is ready to use and dilution not required.

(If necessary use 5% of clean water)

  • Recoating Interval is 20 minutes
  • Apply 1 – 2 Coat as per requirement.

Note : Drying time depends on environmental condition                  such as humidity and temperature.

HEALTH & SAFETY

Always keep paint out of reach of children. Ensure good ventilation during application and drying. Do not smoke while painting.